ADRS
TRAINING REQUIREMENTS
and
NON-PERFORMANCE
ANALYSIS
PURPOSE
To inform DCSED TRADOC of the planning
and program considerations for TASS
support to the Army Division Redesign
Study.
AGENDA
85% DMOSQ STRATEGY
ADRS PHASE II
ASSUMPTIONS
CONCLUSION
NON-PERFORMANCE ANALYSIS
85% DMOSQ STRATEGY
A comprehensive strategy to achieve 85%
DMOSQ within a five year span, with detailed
consideration for ADRS, MOS Consolidation,
Multi-Component TASS Structure, Active
Component Requirements, and Modification
of Pre-SMDR Process.
85% DMOSQ STRATEGY
Pre-SMDR Process
• Combined TRAP and RTCC
• Combined ITW and NTCC
DMOSQ Ramp
• Current 72% to FY06 85% DMOSQ
• Increased Requirements for Reclassification Back-log
• Adjusted Requirements for ADRS
• Increased Quota Utilization
• Reduction of Non-Conduct Rate
Multi-Component TASS Organizations
• Military Intelligence (96R, 98G, 97B, 97E)
• Transportation Corp (88M)
• Health Care Specialists (91W)
85% DMOSQ STRATEGY
ARM-G
• Historic data and existing data compared to projected data
• IET Training Seats
• Documented Force Structure
• Retention Rate
Identification of MOS Consolidation
Requirements
• Infantry (11B)
Decreased ADT Requirement for Reclassification
Increased ASI and Transition Requirements (AC
Requirements)
• Multi-Capable Maintainer (CMF 63)
Increased Requirement
2 x ADT POI
• Health Care Specialists (91W)
Increased ADT Requirement
I n r m dcqH Qi i d - rs i r\ rr> ant Dam i i res m ant -
APRS Phase II
Institutional Training Load and Cost
PROJ ECTED
CATEGORIES
FY03
stdnHIcosts
FY04
STDNilCOSTS
FY05
STDNT COSTS
FY06
STDNifcOSTS
FY07
STDNT COSTS
TOTALS
STDNilCOSTS
PHASE 2
1,397
$4,787
2,446
$6,685
3,971
$12,238
1,526
$4,539
2,555
$8,376
11,895
$36,625
PAAR
$1,605
$1,818
$3,970
$1,621
$3,019
$12,033
TRT
$1,877
$3,144
$4,932
$1,632
$2,733
$14,318
TRNM
$1,305
$1,723
$3,336
$1,286
$2,624
$10,274
* Note: Dollars in
ADRS Codes $000
* PHASE I- Identified in ATRRS as Component Code GEX
• PHASE II -Requested Additional Component Code GEY
Increase of $36. 6M FY02-07
* Determined training requirement from most current ARF conversion plan
- New analysis captured changes in unit activation
* Provided by-MOS requirements to DAMO-TRI for costing through ITRM
- Provides more accurate student and school house support requirements
- Same cost factors used for ADRS specific as for all other school requirements
ADRS PHASE II
Top Ten MOS's - Snapshot
MOS Rqmt
54B
1670
11H
1517
95B
1426
88M
851
92A
714
11B
595
13B
566
88H
471
63B
446
92G
401
Aggregate Requirement, based on IET, attrition, and secondary MOS
considerations
ASSUMPTIONS
Inventory Glide Path
Current Inventory 309K
FY07 Inventory (Goal) 273K
Division Restructure, Army Transition, and
Future DoD Reductions will be implemented
across a 3-4 year span
TIE Support (or future TRADOC design)
• Accreditation and Proponent Liaison
• Reduction of "Non-Conducts" through liaison
and staff support
• DL Integration and TATSC implementation from
CONCLUSION
ADRS is one of many significant factors
considered in the projection of student load
and fiscal programming of The Army School
System. Coordination between HQDA, NGB,
USARC, and TRADOC will facilitate a
successful RAMP to 85% DMOSQ to achieve
CSA Guidance.
NON-PERFORMANCE ANALYSI
ANALYSIS TOOLS
Training Analysis on Demand (TAOD)
• Internet Based Quota Managers Tool
• Track Data for Several Fiscal Years (Trends)
• Link SIDPERS, AFAM, and ATRRS Data
• Structured Reports
• Track Soldier Status (* under development)
Changed Dates/Location * Enrollment Cancellations
Completions(Phases) * No-Shows Non-conducts
• Quota Manager Cancels Soldier, and De-obligates Funds
Non-
ATRRS Funding Allocation Model (AFAM)
• Identifies Non-Qualified Individuals (TAPDB /ATRRS cross reference)
• Computes Training Costs
• Compares Training Requirement to Training Selection (by State or UIC)
• Customized Reports
ARNG NON-CONDUCTS
Reason
FY 99
FY00
FY01
Cancelled (No Reason)
11
9
2
Consolidated
74
170
47
Funding
Equipment
10
26
15
Low Fill - Auto
568
401
231
Low Fill - Manual
17
17
13
Instructor
10
6
5
Moved to National Mission
2
10
POI-Invalid
11
16
8
Scheduled class exceeds Tmg Program
2
TRAP Down
173
31
17
Weather
2
1
Total
878
687
340
Total Scheduled
3332
3103
1925
Execution Rate
73.6%
77.9%
82.3%
*
*
Excludes ARNG Specialty courses & CLC. FY 01 is 1 Oct - 1 Jun 01.
* FY01 Aviation Constraints -available/mission capable aircraft
NO-SHOW REASONS
Mission Deployment (6%)
Soldier Fails to Meet Pre-requisites
Soldier Fails APFT (6%)
Height/Weight Standards (2%)
Soldier Fails Phase I of a Multi-Phased Course i
Civilian Employment or College/School Conflict
* Class rescheduled/consolidated
* Late notification
* Soldier failed to plan
Travel Time or Distance for IDT
* Class consolidation moved location to another state
Personal Problem (6%)
Injury/illness (6%)
Status Changed (24%)
ON-CONDUCT REDUCTION
TRAP Refinement
* Identify and resolve constraints prior to execution window.
* Discontinue funding/scheduling classes that typically non-conduct
Enforced scheduling policy
* Prohibit schools from over-scheduling
* Reduce class rescheduling
* Unit ATRRS Operators alerted to changes
Reduce ADT/IDT Class Consolidations
Cross-Component Resourcing to eliminate school house
constraints
Consolidated/Nationalized low density MOSs
Surfacing Issues for Resolution at NTCC